Home | About me | Contact | What's new
 

San Antonio
Freeway system
  Freeways
    I-10 East
    I-10 West
    I-35 North
    I-35 South
    I-37
    Kelly Pkwy
    Loop 410 (I-410)
    Loop 1604
    SH 151
    Spur 371
    US 90 West
    US 281 North
    Wurzbach Pkwy
  Construction projects
    I-10/DeZavala
    I-10/Leon Springs
    I-35/Loop 410
    I-35/Selma
    SH 151/Loop 1604
    Loop 1604/Braun
    281/1604 intchg
    Wurzbach Pkwy
  Primer
  History
  2011 traffic statistics
  Etcetera
    Media galleries
    Tollway system
      Loop 1604 tollway
      US 281 tollway
    TransGuide
    10/1604 yield signs
    History of 281/410
Other roads & more
FAQ


Twitter

Facebook

Blog

San Antonio Area Freeway System
PROJECT INFO: I-35 from Judson to FM 3009

This page last updated March 22, 2013

Project locationLocation: I-35 from Judson Rd. to FM 3009

Description: This project will add one additional main lane in each direction between Loop 1604 and FM 3009 and revise several ramps. The northbound I-35 exit to Forum Blvd. will be reconfigured to fly over the traffic entering I-35 from Loop 1604; this will eliminate the significant weaving problem there that is a major safety issue and creates recurring congestion.  Turnarounds will be added at FM 3009, FM 1516, and at Loop 1604 and Lookout Road.  Additional auxiliary lanes will be added southbound between Loop 1604 and Judson Road.

How this project will help: This area experiences recurring congestion due to insufficient capacity and obsolete ramp configurations.  The opening of the Forum has especially exacerbated congestion in the area particularly in the I-35/Loop 1604 interchange.  Additional main lanes will obviously increase the capacity of the freeway.  Changing the northbound collector (Forum Pkwy. exit) to fly over the entrance to I-35 northbound from Loop 1604 will eliminate the dangerous and congestion-inducing weaving that takes place there.  Instead, northbound I-35 traffic destined for Forum Pkwy. will be deposited directly onto the access road.  The new mainlanes on either side of the Loop 1604 interchange will help smooth merging in those areas which should help reduce congestion.

Timeline: Construction started in October 2012 and is expected to be complete in Spring 2014.

Schematic: Click on the image below to see an annotated overview schematic of this project.  The base schematic is courtesy of TxDOT; the annotations are my own.  Keep in mind that this is a simplified schematic and is not to scale.  More detailed schematics will be posted when the project goes to bid.




Other sites of interest
TxDOT - IH-35 NE Operational Improvements
http://www.txdot.gov/inside-txdot/projects/studies/san-antonio/ih35-us281.html



All donations are much appreciated and are used
to offset the expenses of operating this site.
This page and all its contents are Copyright © 2013 by Brian Purcell

NOTICE
The information provided on this website is provided on an "as-is" basis without warranties of any kind either express or implied.  The author and his agents make no warranties or representations of any kind concerning any information contained in this website.  This website is provided only as general information.  The author expressly disclaims all liability with respect to actions taken or not taken based upon the information contained herein or with respect to any errors or omissions in such information.  All opinions expressed are strictly those of the author.  This site is not affiliated in any way with any official agency.